PROJECT FEASIBILITY
PKR · square feetProject costing
Set the project areas. Build the budget. Review changes before saving.
SAVED PROJECT COSTStays unchanged until Save
PROPOSED PROJECT COST
BUILT-UP AREA
CHANGES TO REVIEW
Project parameters
Project-wide inputs feed area-based costs. Area percentages always show their basis.
100% of plot area
All scheduled levels, including any basement
Storey schedule
Saleable = built-up − circulation − other non-saleable area.
| Storey | Built-up · sq ft | Circulation | Other non-saleable · sq ft | Saleable · sq ft | Sale rate · PKR / sq ft |
|---|
Storey areas roll up to project totals. Selling rates are retained as project assumptions; they do not change the cost plan.
Project cost plan
Major estimates and their detailed breakdowns.
| Cost / breakdown | Calculation | Previous · saved | New · proposed |
|---|
Tab / Shift+Tab moves between editable fields. Deleted rows remain until Save.